Weekend System Maintenance July 30 - August 2 2010
We will be doing some major infrastructure updates to our core backend systems over the weekend July 30 - August 2 2010.
There may be some system downtime at times. Please be patient with us. All should be resolved by August 2 2010.
Thanks.
spellr.us Team
This entry was posted
on Friday, July 30th, 2010 at 12:53 pm and is filed under Uncategorized.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.